Location
North Carolina.
Area
18,500 ft2
3S Team designed MEP system ISO class-8 cleanroom for a water bath, INH infill room, and QC lab for the pharmaceutical manufacturing facility in North Carolina.
3S MEP provided following MEP engineering services. See below for further details.
HVAC :
- Ventilation design as per IMC-2015
- Designed Process Exhaust and Lab Exhaust air system.
- Heat load calculation with help of HAP 5.1.
- Sizing and selection of RTU, Desiccant Dehumidifier, and Humidifier As per process requirements.
PLUMBING:
- Engineered Sanitary waste and Domestic water supply system.
- Engineered Lab waste drainage system and Acid Neutralizer.